job | Description (these prices include all materials) | labour |
1 | Changing an exposed cloakroom waste. It’s never actually that simple, so half a day
| £125 |
2 | Any sink in a cabinet, or a bath. This may actually take a half day
| £125 |
2a | It may then take another bloke, a day to rebuild the bath panel | £200 |
3 | If a bathroom basin pedestal has to be removed and the basin drops, he will charge for a day
| £210 |
4 | To change a shower waste, the base and cubicle very often need to be removed with all the attendant problems that entails. Call it two days
| £450 |
FAQs 'traffic light' guide
Simple plumbing work.
www.buildingsheriff.com
Copyright The Building Sheriff Ltd 2017