These prices don’t include the underlay or flooring because flooring varies in price so much.
job | Description | labour |
1 | Your 15’ x 15’ (4.5m) living room is getting the treatment with a “click” laminate floor. The builder is taking up the carpet, (you are going to lay it down in the garage for some inexplicable reason), moving the furniture, (not the electrical stuff) and putting it all back on completion. He will screw the existing floor down where necessary, lay the new floor, supply and fit the quadrant, and fill any tiny gaps. This will take 2 men, 1.5 days | £450 |
2 | Still with the same room, the builder’s taking up the carpet and moving the furniture etc. but this time he’s laying a solid wooden floor. He will use felt underlay as before but this time all the tongue and grooved joints will have to be secured with a good wood glue. This is obviously more labour intensive as the fitter will have to apply glue to each joint, force them together and remove any excess glue with a damp sponge. This will take 2men 3 days | £900 |
FAQs 'traffic light' guide
Simple carpentry work.
Click herringbone will cost you - it's tricky.
Do you remove all of the skirting boards and architraving and then replace new - AND redecorate? Or do you use that horrible beading?
www.buildingsheriff.com
Copyright The Building Sheriff Ltd 2017