“Labour” at £175 a day (tradesman) £100 (labourer), includes incidental fixings etc. and tipping charges. “Materials” if mentioned, are larger things (a boiler) and stuff only you can choose (tiles etc). Also VAT must be added all round.
Job | Description | Cost |
1 | Lets assume the room is empty. This will take 2 men 2 days. and the materials will be £200. | £575 |
Plus materials etc. for both these jobs. | £230 | |
2 | Let’s assume all the furniture and carpets have to come out and be replaced afterwards. The 2 chaps will do this but the carpet will need to be cut down and re laid by professional fitters. Let’s call it 3 days, including the fitters wages. | £875 |
3 | Whose painting it? If it’s the chippie, using acrylic paint he can apply three coats in one day, so including the price of the paint…….. | £220 |
FAQs 'traffic light' guide
Simple carpentry work.
Choosing your design.
Moving radiators and electrics to accommodate the new panelling will increase the cost of the job.
www.buildingsheriff.com
Copyright The Building Sheriff Ltd 2017