Job | Description | Labour |
1 | Let’s keep it simple. A rectangular, foot traffic only patio, just below lawn level across the back of your house. So that’s 6.5 metres wide and 4.5 deep. There’s an old path there at the moment and the rest is lawn which goes right up to each side fence. This will take 2 men, 5 days | £1375 |
Plus materials, tipping etc. for the above | £825 | |
2 | Same job but the garden slopes down so you want a foot high retaining wall at the lawn end with what will always be an annoying little step in the middle. The wall will continue at the sides back to the house and have copings all round. This will take 2 men 7 days | £1925 |
Plus the materials etc. for all of job 2 | £1025 | |
3 | Same as either of the above but you have decided you want different sized slabs and a circle in the middle. This will take longer and you will have slabs left over because no one knows how many of each kind you want until the last one is laid. He will also have to go back to the merchants to by the odd ones he needs to finish off with. So add… | £300 |
FAQs 'traffic light' guide
Bread-and-butter for a specialist firm.
You may have to create a much stronger foundation than you are banking on if you are driving your car on this.
Paviors can sink under car wheels over time if the base isn't sufficiently compacted.