Job | Description | Labour |
1 | Lay a 4” thick concrete base for a “normal size” (15 foot square?) conservatory. This will have a 300mm deep foundation around the edges and will be sealed against damp but will have no insulation etc. All the excavated material will be “carted away” (though I have to admit my old cart’s a bit past it nowadays). We assume there is mini digger etc. access. 2 men will take 2 days. | £550 |
Plus materials, tipping etc. for the above | £750 | |
2 | If you want three, 2’ high, insulated cavity walls building on top, with a gap for doors. This will take 2 men a day inc. materials so add…….. | £600 |
3 | If you want the floor insulating add……… | £490 |
FAQs 'traffic light' guide
Dig and pour concrete. Then build a wall!
For all job costs click on the appropriate section below: