In a normal sized kitchen
Job | Description | Labour |
1 | Remove the lino and kick boards, fit thin insulation, UF matting, combined roomstat & timer and connect up to the main switch board. 1 man 1.5 days. Putting a floor on top is not included | £285 |
Plus the materials for the above… | £500 | |
2 | Remove the floor boards as well and fit a “wet” system plus decent insulation, all piped up to and operating in tandem with, your existing central heating system. Then fit a new flooring sheets suitable for tiling or a laminate floor. 2 men 3 days. Then you will have to get the floor fitted | £850 |
Plus the materials, tipping etc. for the above… | £425 |
Job | Description | Labour |
1 | Remove the bathroom carpet, fit under carpet UF matting and a combined roomstat & timer and connect up to the main switch board. That’s 1 man 1.5 days | £285 |
Materials for the above job……. | £450 | |
2 | As above, but fit a cable system in an irregular shaped “normal sized” bathroom. That’s 1 man 2 days. But the cable is cheaper than matting so the price is about the same. Then you will need special underlay but the old carpet can go back down. So in total, that’s about…… | £750 |
FAQs 'traffic light' guide
Not a lot.
Measuring the mats/cable to fit precisely. The plumbing for a wet system
Do you have an RCD fuse board? If not you will need and RCD fused spur.