Bathroom Floor
Job | Description | Cost |
1 | Remove the carpet, fit under carpet UF matting and a combined roomstat & timer and connect up to the main switch board. This will take one man a day and a half …£300: materials will cost £450 | £750 |
2 | As above, but fit a cable system in an irregular shaped “normal sized” bathroom. This will take 2 man days, but the cable is cheaper so the price is about the same. Then you will need special underlay but the old carpet can go back down | £750 |
Job | Description | Cost |
1 | Remove the lino and kick boards, fit thin insulation, UF matting, combined roomstat & timer and connect up to the main switch board. This will take one man a day and a half …£300: materials will cost £500. Putting a floor on top is not included | £800 |
2 | Remove the floor boards as well and fit a “wet” system plus decent insulation, all piped up to and operating in tandem with, your existing central heating system. Then fit a new flooring sheets suitable for tiling or a laminate floor. This will take 2 men 3 days…..£900, materials……£300. Then you will have to get the floor fitted | £1200 |
FAQs 'traffic light' guide
It's all a bit tricky.
Getting the right-sized mats/cable for electric. A wet system is better and easier (for a pro) but it is more expensive. You may need to upgrade your fuse box/consumer unit.
Broken cables, the chap forgets to put a thermostat under the flooring, leaking pipes - it's all possible.
www.buildingsheriff.com
Copyright The Building Sheriff Ltd 2017