Job | Description | Labour |
1 | You have a three-bed semi either brick or render in good condition. It’s being stabilised first, then painted with 2 coats for the first time and there is good ladder access. This will take 2 tradesmen 2 days | £700 |
Plus materials etc. for the above | £200 | |
2 | As above but it’s already painted, doesn’t need stabilising and the new paint is the same colour. This will take 1 day inc. materials. | £500 |
3 | Same house but only one wall needs stabilising and painting with 2 coats for the first time. That’s 1 man, 1 day inc. materials. | £280 |
4 | You have a three bed unpainted good condition pebble-dashed semi. It is being stabilised and painted with 2 coats for the first time and there are no ladder access problems. This will take 2 men 4 days. | £1400 |
Plus materials etc. for the above | £275 | |
5 | As above but it’s already painted, doesn’t need stabilising and the new paint is the same colour.
This will take 2 men, 1.5 days. But they will charge for 2… so inc. materials. | £850 |
6 | Same as job 4 (pebble dashed) but once again only one wall needs doing. They will get it done in a day but use more materials. | £450 |
7 | You have a large five bedroom detached pebble-dashed house that is already painted, the paint is sound and you want to freshen all four sides with two new coats of paint for cosmetic reasons. This will take two men 3 days. | £1050 |
Plus materials etc. for the above | £250 |
FAQs 'traffic light' guide
As long as it's in the spring/summer/autumn, then everything!
Access around the house. Can he reach with his ladders. Some of your plants may come a cropper.
You may need expensive scaffolding - especially over conservatories and glass roofs.