Job | Description | Labour |
1 | With a full burn off and with a small amount of rot and replacement to sort out, on a 3 bed semi with all wooden windows and good ladder access, will take two tradesmen 10 days. | £3500 |
Plus materials etc. for the above | £250 | |
2 | Same house, with a cheap and cheerful job, (Quick scrape and sand down, bit of filler here and there, prime exposed timber, then use acrylic undercoat and top coat from the nearest DIY shed). This will take 2 men 4 days. | £1100 |
Plus materials etc. for the above | £100 |
“Labour” at £175 a day (tradesman) £100 (labourer), includes incidental fixings etc. and tipping charges. “Materials” if mentioned, are larger things (a boiler) and stuff only you can choose (tiles etc). Also VAT must be added all round.